SGA Growth  ·  Techstack  ·  July 2026

GoHighLevel — Phase 1 Launch Plan

10 general-practice pilots with Grow Dental — one verification office live by July 18, remaining nine paced through July 24. Two-office specialty track launches by August 15; a 5-office Set Mode training beta runs in parallel.

Source workbook: ghl-general-round1.baseline-2026-07-10-v3 · SOW dated 2026-07-15, amendments pending Grow acceptance

Commercial Frame

The Deal & the Guardrails

10 × $299
General-practice pilots via Grow Dental — Month 1 one-time setup fee. Nothing beyond Month 1 is authorized under this SOW.
9 on HOLD
Named backups in the workbook — activated only if a priority location falls out. Not part of the spend.
2 × 3-mo
Specialty offices (Amelia Island + Beaches Periodontics) on the full 3-month engagement including PRD training.
Launch Calendar

Four Dates Carry Phase 1

Fri 7/18
Verification office live
1 GP location, silent mode
Amy + Grow walk it end-to-end
Fri 7/24
Target: all 10 GP live
Remaining 9 paced through 7/24, subject to Wave 1 outcome
Fri 8/15
Specialty live
Amelia Island Perio
Beaches Perio
Verify one, pace the rest
One office live by 7/18. Amy + Grow walk it end-to-end on a live call. Remaining nine roll only after Wave 1 pipeline is confirmed.
Website placement
Once Grow shares the code, Amy coordinates with Don/Wyatt for pixel install or form replacement per the CMS split.
After 8/15
No additional specialty offices until September. GP Wave 2 waits on the Week-8 readout.
Wave 1 · Verification office by 7/18

Start Where the Media Spend Is

Verification-first, not race-to-two: SGA elects one of these two as the verification office to launch by 7/18. Amy + Grow walk it end-to-end on a live call. Once the pipeline captures, tags, and routes leads correctly, the second office and the remaining eight roll through 7/24.
Roster · Batch 1

The Priority 10 — General Practices

PracticeCodeStCMSIntegrationNeuralityPeerLogicWave
Pryor — LebanonPRYRFDTNDDTNWP + ElementorpixelActiveYes7/17
Smile Center OrlandoSCO-FLFLWP + Divireplace-formActiveYes7/17
Benner Townsend DentistryBTD-GAGAWP + DivipixelActiveYes7/24
Lake Shore — Saint CloudLAKEDCFLDDFLWP + Otherreplace-formActiveYes7/24
Peach Family — Fort ValleyPCHFDGGADDGAWP + DivipixelActiveYes7/24
Smile Gulf CoastSGC-MSMSWP + Divireplace-formInactiveYes7/24
Southern Oak Dental ConwaySOAKCOSCDDSCWP + Divireplace-formActiveYes7/24
Ways StationHIGHDTGADDGAWP + Divireplace-formActiveYes7/24
Main St Family Dental — LexingtonPALMCDSCDDSCWP + DiviTBDActiveYes7/24
BelfastBELFSTGADDGAWP + DiviTBDInactiveYes7/24

Belfast is a crosswalk placeholder — EIN / legal entity / GBP pending Scott. Neurality active on 8 of 10; all 10 live on PeerLogic.

Bench

Backups — Named, Priced at $0, All on HOLD

PracticeCodeLegacyStNeuralityPeerLogicHold Reason / Note
Lake Mary — Lake MaryLKMARYFLDDSGAFLInactiveYesNew site launches August
OakwoodOAKSMLGADDSGAGAActiveYesNew site launches August
ACD WestportWSTPRTKSDDGen4KSActiveYes
Clay Center Family Dental CareCLAYFDKSDDGen4KSActiveYes
GDG Gage CenterGAGEDGKSDDGen4KSInactiveYes
Heritage Dental AssociatesHERITGUTDDGen4UTActiveYesScheduler already live
Liberty Family DentalSPHSGAGAActiveNoMid-rebrand (ex-Spinnaker); not on PeerLogic
Rock Hotel DentalRCKHTLUTDDGen4UTInactiveYes
Wyoming DentalWYOMNGMIDDGen4MIInactiveYesPhone sourced from website (crosswalk blank)

A backup activates only if a priority location falls out of Batch 1. Workbook v3 lists 9 backups (cover email referenced 10).

Specialty Track

Two Perio Offices, Full 3-Month Engagement

DAP-FL · Fernandina Beach FL

Amelia Island Periodontics

  • ameliaperio.com · WP + Elementor · pixel
  • Neurality Inactive · PeerLogic Yes
DFP-FL · Jacksonville Beach FL

Beaches Periodontics

  • beachesperiodontics.com · WP + Elementor · pixel
  • Neurality Inactive · PeerLogic Yes
Attribution caveat: both offices share the same Dr. Field–brand Facebook and Instagram pages. Social clicks cannot be separated by page — per-office attribution must come from UTMs, landing URLs, and tracked phone lines.
Parallel Track · Requested via Amendment 4

Set Mode Training Beta — 5 Offices, 90 Days

Why Implants First
  • Higher case value → more on the line per call
  • Training principles trickle down to general calls
  • Cosmetic material lands later this week — can add cosmetic vertical once ready
  • Avoids GP pushback (offices are already stretched integrating other platforms)
Engagement Lever
  • Most-improved office competition — winner gets a trip / comparable prize
  • Prize structure defined by Grow
  • Everyone is stretched — the competition is what gets real participation
Not part of the $299 GP pilot. Materially different engagement (training vs. lead capture). SGA has requested a separate SOW from Grow via Amendment 4 to the 7/15 SOW — fees, deliverables, and start date defined in that document.
Attribution · Last-touch model

One Taxonomy — 14 Channel Tags

TagSource eventStatus / note
website-formGHL pixel / replaced formPrimary pilot metric
phone-ghl-numberHL tracking # → PeerLogic office lineNative HL analytics
gbp-mapGHL native GMB integrationDrops Yext dependency
google-organicUTM / referrerNeeds UTM discipline
social-organicUTM on postsPromoRepublic UTM setup
google-ads / meta-adsGHL native links + phone matchAPI conversion tracking restricted (medical/dental)
yelp · direct · referralReferrer / manualReferral = front-desk workflow
website-chatNeurality webhookNo webhook today — change order
neurality-booknowNeurality webhookNo webhook today — UTM report ~7/29
otherUnmatched fallbackTarget <5% of total
Health check: if the "other" bucket exceeds 5%, attribution is leaking and the taxonomy gets revisited before Wave 2.
Pre-Launch Diligence · Post 7/14 & 7/15 Calls

Vendor Questions — What's Actually Open

Neurality (6 → 2 open)

Still open:

  • Which data is PHI (Phase B / BAA) vs. aggregate counts (Phase A)?
  • Per-practice data isolation, or group-scoped feed?

Resolved 7/15: No webhook today (Neurality "looking into it"); export is email-based, 5-10 min, custom date ranges work; UTM source-per-location report ~7/29; bookings data ownership discussed but not documented.

PeerLogic (5 → 0 open)

Not needed — Grow's HL-tracking-number model bypasses PL webhook entirely.

Resolved 7/14 (approach): HL provisions one tracking number per pilot location, forwards to PL office line, HL tracks + analyzes + records natively. Kills the per-call-webhook / caller-ID / outcome-tagging questions. PL Domain enrollment gap becomes irrelevant.

Execution · Post-Amendments

Week-by-Week Plan

WhenMilestoneOwnerNote
Wk 1 · 7/14SOW amendments sent to Grow; Amy holds countersignatureAmy4 amendments: pace, fee scope, phone tracking, Set Mode SOW
Wk 1 · 7/14Confirm intranet ingest URL with Mike FetrowAmymarketing.ghl_webhook_events has zero rows — endpoint may not be deployed
Wk 1 · 7/15Neurality vendor call complete; chat widget code to GrowAmyNo webhook today; UTM source-per-location report ~7/29
Wk 2 · 7/18Verification office live in silent modeGrow + SGA1 GP location, Pryor or Smile Center Orlando; live-call walkthrough
Wk 2 · 7/18HL tracking numbers provisioned + forwarded to PeerLogic office linesGrowPer Amendment 3 to the SOW
Wk 2-3 · 7/24Remaining 9 GP locations paced through 7/24, subject to Wk 2 outcomeGrow + SGAEnd-to-end form test on all 10; silent mode, Grow QA inbox routing
7/29 (est)Neurality UTM source-per-location report availableNeuralityInterim path until webhook change order priced
8/15Specialty launch — Amelia Island + BeachesCombined3-month engagement incl. PRD training
Parallel track — Set Mode Training Beta (separate SOW requested via Amendment 4)
Wk 2Amy + Dakota select 5 implant-heavy PeerLogic offices for Set Mode betaAmy + DakotaDoctor + OM + phone staff, 90-day commitment
TBD by GrowSet Mode beta kickoff (5 offices, 90 days, competition mechanic)GrowStart date defined in separate SOW
Week-8 gate
Wk 8 · ~9/130-day data pull + SLT reportAmyFirst lead-count answer to the CEO
Wk 8 · ~9/1Pilot readout + Wave 2 decisionAmy + GrowExpand / Deepen / Restructure / Conclude
Risks & Decisions

Open Items & the Week-8 Gate

Grow revised proposal pending. Awaiting Grow's countersignature of Amendments 1-3 and revised proposal reflecting Month 1 setup scope, softened pace, HL-phone-number model in D2.
Set Mode Beta SOW pending. Requested via Amendment 4 — 5 offices, 90 days, implant focus, competition mechanic. Not commingled with the $299 GP pilot.
Ingest endpoint unverified. marketing.ghl_webhook_events has zero rows — confirm with Mike Fetrow before Grow builds the snapshot workflow.
Neurality webhook = not launch-ready. Interim path: UTM source-per-location report ~7/29. Full webhook plumbing = future change order. 2 of 14 channel tags won't fire during silent-mode pilot.
Belfast is a placeholder. Not in the Master Crosswalk — EIN, legal entity, GBP pending Scott. Launches with the 7/24 pace only if resolved.
Slide 1 of 11

SPEAKER NOTES